Total Waste Solution - Metal/ Precious Metal Recycling
We ventured its expansion plan to associate with Krubong Recovery Sdn Bhd which located at Krubong Industrial Area, Melaka. It has obtained its full recovery license by Department of Environment Malaysia by 30 July 2007. We utilize the technologies in metallurgical science which includes selective reverse electro-plating lines, mechanical crushers and selective separators and state of the art furnace to recover the precious metal materials. This plant is capable to process 1000mt/mth of scheduled wastes including electronics waste. We have a fully fledged of in house laboratory facilities, waste water treatment facility and scrubber system.
The schedule waste codes that include under the full recovery of this premise include: | ||
SW110
|
Electronic waste | |
SW104
|
Zink, solder, nickel, copper, aluminium dross/ paste | |
SW325
|
Epoxy waste | |
SW414
|
Spent alkaline waste | |
SW423
|
Photographic waste |